Waste Management

Development study and procurement of Material Recovery Facility (MRF) for municipal solid waste and construction waste

Client: Fujairah Municipality

MIMC provided engineering services including a project development study, including design, procurement and coordination. The project consisted of a 300 TPD processing centre for municipal waste with a maximum capacity of 500 TPD through extended operating hours or shifts.

MIMC provided engineering services including a project development study, including design, procurement and coordination. Our talented team suggested the correct optimal design technology which allows our client to increase recycling capability while saving on costs. Our facility presents a high degree of manual sorting and was provided with high quality equipment. The plant requires minimal maintenance and has the ability to automate and expand as needed.

Fujairah Compost Plant:

MIMC developed the most efficient organic waste compost facility for the city of Fujairah. MIMC role is to coordinate every single aspect of the project and make sure that every party is doing their related job properly and according to time, quality and budget. MIMC advised Fujairah Municipality to choose the suitable equipment and guided the project in order to establish a facility that will decompose organic substances as efficiently as possible and convert them into stable and plant-compatible substances hence delivering high quality products within a rotting period and with the lowest possible emission levels.